Load testing on Peenya flyover, traffic banned from May 5 to 8

1 hour ago 3
ARTICLE AD BOX
The NH-4/Tumakuru Road and the flyover is a key entry/exit point for the city towards/from all northern districts of the State.

The NH-4/Tumakuru Road and the flyover is a key entry/exit point for the city towards/from all northern districts of the State. | Photo Credit: K. MURALI KUMAR

The National Highways Authority of India (NHAI) will carry out load testing on Peenya Elevated Flyover on NH 4 from May 5 to 8 between 5 a.m. and 11 a.m. During these days, traffic has been banned on the key flyover. This is expected to lead to huge traffic congestion.

The NH-4/Tumakuru Road and the flyover is a key entry/exit point for the city towards/from all northern districts of the State.

Published - May 01, 2026 08:19 pm IST

Read Entire Article