Bengaluru’s first double-decker flyover in the southern part of the city is finally ready to be fully operational, but an inspection by the Bengaluru Traffic Police (BTP) has revealed a likely bottleneck at the first junction (Aravind Junction) after the end of the down ramp near Ragigudda.
Now, the BTP has planned interventions such as increasing signal pass time and closing two left turns after the down ramp during peak hours, among others, to tackle the situation.
4 days ago
12




English (US) ·